🏛️ NDDEQNOVReplyKit

North Dakota Department of Environmental Quality — Notice of Violation Response Package Generator

NDCC §23.1-08-02 Notice of Opportunity to Cure | NDAC 33.1 | ND PSC Dual-Agency Pipeline Siting | Bakken Shale

⚡ NOC Pre-NOV Cure — UNIQUE in 50-State Series 🛢️ Bakken Shale — 1,200+ Operators 🔗 ND PSC Dual-Agency Pipeline ($24.99) 53 Counties • Williston Basin Auto-Detect $149.99 PAYG
⚡ NDCC §23.1-08-02 Notice of Opportunity to Cure (NOC) — FIRST Pre-NOV Procedural Precursor in 50-State Series
North Dakota is the ONLY state in the series with a mandatory pre-NOV administrative step. Under NDCC §23.1-08-02, before NDDEQ can issue a formal NOV, the Department must first provide a Notice of Opportunity to Cure — allowing the respondent to demonstrate that the violation has been corrected.

NOC 3-Section Mandatory Format:
Section 1: Root Cause Analysis (NDCC §23.1-08-02(1)(a) causal factors)
Section 2: Corrective Action Schedule (milestones, responsible parties, completion dates)
Section 3: Non-Recurrence Certification (management certification + systemic prevention)

If NDDEQ accepts the Cure Showing, the formal NOV is prevented entirely.
🛢️ Bakken Shale — Williston Basin (1,200+ Active Operators): North Dakota's Bakken formation is the #2 oil-producing region in the US. Continental Resources, Marathon Oil, Hess, XTO Energy, and 1,200+ operators hold NDDEQ air/water/spill permits. NDIC gas capture orders (NDAC 43-02-03-60.2) and NDDEQ flaring enforcement create dual-agency compliance obligations unique to Bakken operations. Our tool auto-detects Williston Basin counties and applies enhanced enforcement context.
🔗 ND PSC Dual-Agency Pipeline Siting Add-On ($24.99): North Dakota's Public Service Commission (PSC) has independent enforcement authority over pipeline siting under NDCC §49-22 — separate from NDDEQ. Operators facing both NDDEQ environmental enforcement AND PSC siting enforcement need parallel response strategies. No other state in the series has both an environmental agency AND a PSC with independent NOV authority over the same facility.
📋

NDDEQ NOV Formal Response

NDCC §23.1-08-01 standard 30-day response. Factual dispute, corrective actions, penalty mitigation. NDAC 33.1 citation accuracy.

NOC Cure Showing ★

NDCC §23.1-08-02 — 3-section mandatory format. Root Cause + Corrective Schedule + Non-Recurrence Cert. Prevents formal NOV if accepted.
🤝

Consent Agreement Counter-Proposal

NDAC 33.1 penalty settlement framework. SEP proposal. Stipulated penalty schedule. Force majeure (ND winter operations).
🧮

NDCC §23.1-08-04 Penalty Worksheet

All 6 statutory penalty factors. $12,500/day max. Good faith, compliance history, economic benefit analysis. SEP offset.
🔗

ND PSC Pipeline Schedule (Add-On)

NDCC §49-22 pipeline siting compliance. PSC-NDDEQ dual-agency coordination. Route deviation, reclamation, landowner notification. +$24.99
NDDEQ Field Offices:
Bismarck (Central HQ) Williston (Bakken Core) Dickinson (Bakken West) Minot (Northern ND) Grand Forks (Red River Valley) Fargo (Eastern ND)
Williston Basin / Bakken Shale Counties:
Williams (Williston) McKenzie (#1 Oil Production) Mountrail Dunn Divide Burke Stark (Dickinson) Mercer McLean Bottineau Ward (Minot) Billings Golden Valley Slope Bowman McHenry Renville

Pricing

NOC+NOV Combined ★
$219.99
Pre-NOV cure + full response
API / Consultant
$449/mo
Unlimited API access

Add-on: ND PSC Pipeline Siting Compliance Schedule +$24.99

Generate Your North Dakota DEQ NOV Response Package

🔗 ND PSC Pipeline Siting Compliance Schedule +$24.99
ND Public Service Commission (PSC) independent enforcement under NDCC §49-22. Parallel PSC compliance schedule for pipeline route deviation, environmental mitigation, post-construction reclamation, and landowner notification. Joint PSC-NDDEQ inspection request. Penalty coordination to avoid double-penalty. Unique in series: ND has both an environmental agency AND a PSC with independent NOV authority over the same facility.